The Tool

The award-winning Rubblizer™ can transform both plug and abandonment and slot recovery. The tool improves efficiency and predictability of cut and pull, perf and wash and perf and squeeze with trial results showing up to 90% less force is required to pull casing.

How it Works

Using simple pressure and rotation to manipulate existing casing strings, the Rubblizer™ breaks the bond between cement and casing, effectively rubblizing the cement behind casings. This makes removing casing quicker and more efficient, avoiding the need for costly milling operation and subsequent lost time issues, guaranteeing pulling success rates. The Rubblizer™ can be partnered with existing technologies to enhance plug and abandonment capabilities. It can be used to complement existing cutting, pulling, and jacking technology to reduce cost and uncertainty when removing casing. It also proves to be an excellent addition to perf, wash, and plug technology, raising success rates and assuring adequate wash for post-job cement integrity.

Key Benefits

  • Greater efficiency and success rates compared to conventional cut & pull and perf & wash.
  • Enables longer sections of casing to be pulled reducing time and trips in and out of hole.
  • Enables predictable perf & wash and reliable perf & squeeze operations.
  • Avoids the need for costly milling operation and subsequent lost time issues.
  • Compliments current tool offerings for Fishing/P&A/Slot Recovery Service Providers.
  • Does not transmit any shocks and vibrations up-hole.
  • Simple to operate.

Find Out More

If you would like more technical information about our Rubblizer™ tool, please use the form to your right and download the detailed Rubblizer™ datasheet which includes tool specifications. Or contact Product Line Manager – Abandonment and Recovery Systems, Eoin Wood on eoin@deepcasingtools.com, discuss how our tool can benefit your future operations.

Download Datasheet

6000 3000
50 %
Less Emissions

Reduced Emissions

A projected reduction of 3000MT based on 10 days of rig time saved.

25 12.5
50 %
Rig Time Saved

Time Saved

Even on the most challenging wells, use of the Rubblizer™ can reduce operation time from 25 days to 12.5.