Region:

North America

Technology:

Turborunner™

Objectives: Download PDF

Run 4 ½” liner assemblies in the lateral sections
Eliminate wiper trips

Well Background & Challenges:

Offset wells required wiper trips
10,000ft (3,000m) lateral liners with 30 hydraulic open hole packers and 30 ball drop frac sleeves
Used on 2 different wells in North Dakota and 1 in Wyoming (2 major IOCS)

Results:

No wiper trips needed – to TD first time
Providing confidence to land completions

Value to client:

Eliminated need for costly wiper trips
Reached TD first time with multiple stage packer liner assembly
Proves technology for standard adoption