JOB #1 - Run 114mm (41/2") multistage frac liner in the lateral section
Eliminate reaming / wiper trips
Well trajectory of 90 deg
First Deep Casing Tools run in Canada
JOB #2 - Run 114mm (41/2") multistage frac liner in lateral
Shalerunner™ used to guide casing string to bottom
Insurance to get casing string to TD
JOB #3 - Reamed 151M (495ft) in 2.75 hours to land casing at bottom

Well Background & Challenges:

Offset wells requiring reaming / wiper trips
Well trajectories up to 90 deg

Results:

Liner to TD first time
Providing confidence to land completions

Value to client:

Eliminated need for costly reaming / wiper trips
Reached TD first time with multistage frac liner assembly
Proven technology for standard adoption
Reduced possibility of hole washout - better packer seat