Objectives: Download PDF

Land 16,270ft of 7" liner to TD
Eliminate reaming trip
81/2" horizontal section (87 deg)
Ream and wash down tight spots - RIH

Well Background & Challenges:

Offset wells requiring reaming / wiper trips
Reaming trip eliminated in this run
Second longest 7" liner run in KSA
Longest 7" TCE run in the world
Well trajectory

Results:

16,270ft of liner to TD first time
Reamed 2,269ft of tight hole and obstructions encountered
TCE burst disc ruptured for cementing operations
Drill out performed successfully

Value to client:

Eliminated need for reaming trip
Avoided stuck / POOH liner
Record run in KSA and worldwide
Proven technology for future challenging applications