Updates

Deep Casing Tools is a trusted supplier to major national and international oil & gas companies. We have developed strong relationships with many key operators, and this combined with our excellent service record has helped us to secure repeat sales with numerous regional IOCs and major NOCs. Our track record and the strength of our relationships are evident in the following case studies.

TurboRunner: Tengiz Provence Rig Project

TurboRunner: Tengiz Provence Rig Project

On a Tengiz Chevron Oil (TCO) project, Schlumberger Completions
required a de-risked approach to ensure the lower completion could reach Target Depth (TD).
Download PDF
Our Technology in Action

Our Technology in Action

Check out our latest case study demonstrating the significant time and money savings, as well as reduction in risk, we deliver to our global client base daily.
Download PDF
TurboCaser: Chevron North West Shelf Project

TurboCaser: Chevron North West Shelf Project

Chevron required to run and land critical 9⅝” casing on multiple wells through unstable shales at approximately 3000m TVD.
Download PDF
TurboCaser: BP Alaska

TurboCaser: BP Alaska

BP Alaska required to run a 7” liner through a window in the 9⅝” casing to 13,448 ft target depth at 74 degrees. The aim was to run to TD at the first attempt, cement the casing through the TurboCaser...
Download PDF
TD Pilot

TD Pilot

Despite higher cost sensitivity, areas like North America suffer the same completion deployment challenges as seen around the world. Since its first commercial run in 2017 the TD Pilot™ has now had se...
Download PDF
Casing Cement Breaker: Equinor Huldra Field

Casing Cement Breaker: Equinor Huldra Field

Equinor P&A team required to pull out the 9-5/8" tubular casings, in order to permanently plug and abandon the exploratory well in the Huldra field in the northern part of the North Sea.
Download PDF
TurboRunner: Sarawak Shell Berhad Malaysia

TurboRunner: Sarawak Shell Berhad Malaysia

TurboRunner™ successfully allowed all three well completions to reach TD on three longest horizontal wells in Malaysia for Sarawak Shell Berhad (Shell Malaysia)
Download PDF
TurboCaser: Lundin NCS

TurboCaser: Lundin NCS

Lundin intended to drill injection wells, critical in maintaining well pressure for the field in the longer term. The aim was to run the 95/8” liner to Target Depth first time. After a thorough analys...
Download PDF
TurboRunner: SNEPCO Bonga Reservoir

TurboRunner: SNEPCO Bonga Reservoir

Shell Nigeria Exploration and Production Company planned to drill a new horizontal 2D well to develop the BNW690 reservoir within the Bonga North West field, part of the Bonga Deep Water Project, sout...
Download PDF
TurboRunner: Shell New Zealand Kapuni Field

TurboRunner: Shell New Zealand Kapuni Field

Shell New Zealand’s objective was to land completions in a 6¾” open hole section at a Target Depth of 12,338 ft.
Download PDF