Deep Casing Tools is a trusted supplier to major national and international oil & gas companies. We have developed strong relationships with many key operators, and this combined with our excellent service record has helped us to secure repeat sales with numerous regional IOCs and major NOCs. Our track record and the strength of our relationships are evident in the following case studies.

9-5/8" Rubblizer™ Saves 7 Days Rig Time

9-5/8" Rubblizer™ Saves 7 Days Rig Time

As part of a Slot Recovery project for a major Chinese operator, the Deep Casing Tools (DCT) Rubblizer™ was successfully deployed to enable 676ft of 9-5/8” 47lb/ft casing to be recovered.
Download PDF
TurboCaser™: NOC, Middle East

TurboCaser™: NOC, Middle East

The third of six onshore wells to be batch drilled, the TurboCaser™ was successfully deployed in January 2022 to the Middle East for a national oil company.
Download PDF
TurboCaser™: NOC, Middle East

TurboCaser™: NOC, Middle East

The second of six onshore wells to be batch drilled, the TurboCaser™ was successfully deployed in January 2022 to the Middle East for a national oil company.
Download PDF
MechLOK™: Major Norwegian North Sea Operator

MechLOK™: Major Norwegian North Sea Operator

The MechLOK™ DP Swivel assisted in the deployment of three screen drop-off runs in a horizontal, highly tortuous multi-lateral project.
Download PDF
TurboCaser™: NOC, Middle East

TurboCaser™: NOC, Middle East

The first of six onshore wells to be batch drilled, the TurboCaser™ was successfully deployed in January 2022 to the Middle East for a national oil company.
Download PDF
TurboRunner™: IOC, North Sea

TurboRunner™: IOC, North Sea

An International Oil Company (IOC), in the North Sea, required horizontal well completion screens across the reservoir. Deep Casing Tool's 7" TurboRunner™ was deployed to assist running the lower comp...
Download PDF
TurboCaser: UAE Operator

TurboCaser: UAE Operator

As part of an extended field trial for a United Arab Emirates (UAE) Operator, 9-5/8” turbine powered reamer shoes were deployed to overcome casing running challenges. The 9-5/8” Deep Casing Tool’s Tur...
Download PDF
TurboRunner: Weatherford, TR1P, Malaysia

TurboRunner: Weatherford, TR1P, Malaysia

During a period of low crude oil price, travel restrictions and cost sensitivity, a client sought to leverage rig time savings by combining upper and lower completions into a single-trip.
Download PDF
MechLOK: New Zealand

MechLOK: New Zealand

Our MechLOK was required as part of an Extended Oil Recovery (EOR) programme for an International Operating Company (IOC).
Download PDF
TurboRunner: Shell Sarawak

TurboRunner: Shell Sarawak

Shell Sarawak required horizontal well completions as part of the second stage of a development totalling six new wells.
Download PDF
TurboRunner: Tengiz Provence Rig Project

TurboRunner: Tengiz Provence Rig Project

On a Tengiz Chevron Oil (TCO) project, Schlumberger Completions
required a de-risked approach to ensure the lower completion could reach Target Depth (TD).
Download PDF
Our Technology in Action

Our Technology in Action

Check out our latest case study demonstrating the significant time and money savings, as well as reduction in risk, we deliver to our global client base daily.
Download PDF